Full Off-Grid Solar & Battery Upgrade

Full 3-phase off-grid solar and battery upgrade for a flower farm in rural QLD - We replaced their failing system with a powerful, future-ready setup that keeps the farm running — no grid needed.

Full Off-Grid Solar & Battery Upgrade

Full 3-phase off-grid solar and battery upgrade for a flower farm in rural QLD - We replaced their failing system with a powerful, future-ready setup that keeps the farm running — no grid needed.

About Project

Full 3-phase off-grid solar and battery system for a flower farm in rural Queensland — replacing their failing old setup with a powerful, reliable solution built to last.

Project Date

27/08/2025

Time Frame

2 Days

Client

Flower Farm

Other Projects

Inverter Upgrade: Mitre 10 Plainland
IGA Gatton – Annual Thermal Testing & Compliance
SnapFitness Commercial Solar Installation
Residential Solar & Battery Installation
Victron EV Charging with Solar & Off-Grid Integration
Lockyer Valley Council Field Lighting